Analyse the actual source
The assessment begins with representative data describing the water that will enter the treatment system.
Every responsible treatment concept begins with representative water analysis, actual operating conditions and a clearly defined target. Without these inputs, system performance, capacity and cost cannot be determined reliably.
No universal configuration. No catalogue-based assumptions. First the water and the project data. Only then the technology.
Without a representative analysis, there is no responsible technology design.
Water composition, contaminant concentration, temperature, hydraulic loading, operating cycles and required output quality determine the final configuration. A technically sound proposal must therefore be based on the real project, not on a general description such as “drinking water”, “well water” or “wastewater”.
The assessment begins with representative data describing the water that will enter the treatment system.
Capacity, pressure, temperature, operating hours and maintenance capability influence the technology concept.
Only after the inputs are verified can performance criteria, treatment stages and validation methods be defined.
The initial information does not need to be perfect. It must, however, be specific enough to identify the application, the water source, the required result and the data still missing.
Country, project location, operator, type of facility and the intended use of the treated water.
Public supply, well, river, lake, process water, pool water, wastewater or another clearly identified source.
Recent results, sampling location, sampling date and information about seasonal or operational variability.
Hourly flow, daily volume, operating schedule, peak demand and expected periods of downtime.
Intended use, target parameters, applicable local limits and the measurable result the project must achieve.
Installed technology, available space, utilities, pressure, pre-treatment and known operating limitations.
A technically correct laboratory report can still lead to an incorrect design if the sample was taken from the wrong location, at an unusual operating moment or without considering water variability.
The sample must correspond to the water that will actually enter the proposed treatment system.
Seasonal change, rainfall, production cycles or source switching may significantly affect water composition.
The analytical package must include the parameters relevant to the actual problem and intended use.
Results should identify the laboratory, analytical methods, units, limits of quantification and sampling information.
One sample describes one moment. A project must reflect the conditions under which the system will operate.
Where water quality is variable, additional sampling or a defined pilot phase may be necessary. For international projects, laboratory testing should normally be performed by a suitable laboratory in the country where the system will operate. We review the submitted data and identify whether further parameters or verification are required.
The pathway is designed to reduce technical and commercial uncertainty before equipment, performance or price is promised.
We review the application, location, water source, expected capacity and the result the project owner needs to achieve.
Available analyses and operating information are checked for relevance, completeness and representativeness.
Where necessary, further analysis, laboratory verification or pilot operation is defined before final system sizing.
The result may be a treatment concept, pilot proposal, preliminary configuration or request for additional project data.
The purpose of assessment is not to force every project into one predefined technology. It is to determine which next step is technically justified.
Existing data may be insufficient, outdated or missing parameters essential for reliable treatment design.
Variable or complex water may require testing under defined conditions before full-scale configuration is confirmed.
When the inputs are sufficient, relevant treatment stages, performance criteria and operating assumptions can be defined.
International projects must respect the laboratory, engineering, regulatory and approval requirements applicable in the country where the system will be installed.
The preliminary assessment is based on information supplied by the project owner or partner. It does not constitute final engineering, regulatory approval, a guaranteed treatment result or a binding equipment proposal. Final performance must be defined and verified under agreed project and operating conditions.
Before contacting us, prepare the available information listed here. Documents and laboratory reports can be shared after the initial project contact.
Contact the relevant department and briefly describe the project location, water source, required capacity, available analysis and expected result.
Monday – Friday, 8:00 AM – 4:00 PM (CET/CEST)